who arrives when how

who arriving date/hour leaving date/hour need to be picked up? gave receipt/ticket for travelcosts reimbursed for travel costs
yo & tabi 3/8 evening or /4/8 morning around 10h no, we do need a way to get to nantes on 4/8 yes not yet
easycake 4/8 evening 10/8 morning ? not yet not yet

info up to now:

available technicians & coordinators
technicians:7

coordination: oladayo & makan jah (bla)
bla technicians available: oladayo, makan jahe, scholli, easycake,
tabi,

2 technicians allo & sallam, Thuringen: 2 technicians simon & sisi arriving probably 3/8 evening. coming by car. dont have radio equipment, but know how to work with it. but like to work in teams with more experienced people. Know well how to work with spiders. They will bring at least 5 spider kits along with them.

Luca/brabbelbox said that after mounting and if there is no issues, they can come support us at times.

we registered for 10 people
pad.riseup.net/p/TSC25enquete

Bavarian SI collective / ya-media: is lending us equipment it will travel with Luca (who is from brabbelbox and will together with another person be responsible for the electricity at the camp.)

Reimbursement travel costs

The reimbursement part is different for us. we organize this ourselves and have a budget together with interprise. Me and Makan-jahe will collect your tickets and arrange that you get your travel reimbursed, but be aware that we have a limited amount for interpreters and technicians, so please keep the costs low and book as soon as possible. Did you book already? please send your receipts to us in digital form (can be via signal or email). oladay[at]riseup.net

travel information and location

Also we would like to know when you arrive and leave and if you need a shuttle to pick you up. We can organize the shuttle ourselves if you inform us in time and there is public transport up to 4km from the location.

Info given by TSC25-orga:
Arrival and departure / Arrivée et départ

The camp will take place at the ZAD, at this location: 47.347532, -1.733297. Public transportation is not available to this location. Since it is impossible for us to organize a shuttle for 700 people, it is a great help if people organize the journey to the ZAD themselves and walk the last distance. the best option is to take the following bus connections:

Bus Aléop 320: until stop Vigneux de Bretagne – Église (about 4 km walk along a road) Bus Aléop 371: until stop Vigneux de Bretagne – la Bossière (about 4 km walk on smaller roads, but only feasible with good maps or GPS) Bus Aléop 371: until stop Vigneux de Bretagne – Bois Rignoux (mix of main road then small road or path)

needs & logistics

rough plan of dates:
tue 5 august: arrival technicians/coordinators… Also arrival day of participants. Organize a moment to meet each other, talk through program; needs; plan shifts/teams; introduction to equipment if needed…

wed 6august: Built up equipment 1 location (early!!) & opening plenary in morning and break down, rest of day stands (no need for equipment).

thursday 7 august – friday 8 august – saturday 9 august: full program days 10h-19h with building up and breaking down (8h-20h) On saturday there is a closing plenary planned after 19h. (already possible to break down the other rooms. – Where will be the closing plenary??? how many languages… its a big thing for sure!!!!

sunday 10 august count and pack the equipment

sound equipment
Hey
attached you find a list of sound stuff we will have at the tsc for the different circus tents for the conferences. Out of this we also need to be able to build sth for concerts and movie or theater in the evening. Would you want to get in touch with Kashef who is the cultural prpogram coordinator or should I send the list to Kashef so he can choose things and then you meet up with him once you all arrived to think about how to organise, eg for keys where the stuff is locked? Or anything else I don’t think of?

Also, the real shitty thing is that the sound system of MutMat is broken for now. They are not sure they will be able to fix it till august. I will ask which parts exactly of this list are concerned, I guess the mixing tables work, but who knows. But maybe you can start planning with this…

greetings from the heatwave 🙂